Home » Case Studies » Industrial Floor Coating for Cerulean Milton Keynes

Industrial Floor Coating for Cerulean Milton Keynes

Facts & Figures

  • Completion date: July 2015
  • Location: Milton Keynes
  • Size of floor: 1800 sq m.
  • Colour: Dusty Grey RAL 7037.
  • Existing floors: A concrete floor which had received several coats of floor paint. Steel service covers had also been painted and needed to be prepared and painted to match the floor.

A 1800 sq m concrete floor which had received several coats of floor paint was in need of repair and refurbishment.

Steel service covers had also been painted and needed to be prepared and painted to match the floor.

For practicality and to minimise disruption, the installation had to be completed over three phases.

Each phase had a duration of three days over an extended weekend comprised of a Friday, Saturday and Sunday leaving the floor ready for use on the following Monday.

Cerulean Required a cost effective and hard-wearing coating with the aim being to lift the presentation of their Milton Keynes facility.

It was important that the floor would last at least 5 years. We can confidently support the coating with our materials and workmanship guarantee.

Vacuum contained shot-blasting was used to prepare the floor in open areas with diamond grinding employed in more congested areas around machinery and racking. Dusty Grey RAL 7037.

Installation Programme: For practicality and to minimise disruption, the installation had to be completed over three phases.

Each phase had a duration of three days over an extended weekend comprised of a Friday, Saturday and Sunday leaving the floor ready for use on the following Monday.

Preparation for Industrial Flooring

Vacuum contained shot-blasting was used to prepare the floor in open areas with diamond grinding employed in more congested areas around machinery and racking.

Industrial Flooring system

A cost effective and hard wearing coating with the aim being to lift the presentation of their Milton Keynes facility.

It was important that the floor would last at least 5 years. We can confidently support the coating with our materials and workmanship guarantee.

After visiting a nearby installation (March 2013) for Adam Equipment, Cerulean selected Elgood Industrial Flooring’s Britdura 750 High-build solvent free Epoxy Floor Coating.

Find out more about our professional floors – or get a quick quote today